Abgas-Schallschutz und Energietechnik GmbH
Duisburger Str. 19
D-14612 Falkensee
Merseburg
The plant consists of 2 locations with one CHP each and at one location additionally
a boiler. Our service consisted of the delivery and assembly of 3 steel chimneys
with the associated welded exhaust gas inter connectors. In addition, we have
entire steel construction for the heating centres, including the inspection and boiler
platforms. The silencers have been specially designed for the heaters and are very cramped
space conditions.
assembly
connecting line
assembly
connecting line
assembly
exhaust silencer
BHKW
assembly
assembly
assembly
assembly
assembly
assembly
assembly
assembly
anchor basket